Pella Sioux Center Operations
Pella Corporation
Sioux Center, Iowa
Client Challenge:
Accommodate manufacturing of a specific window type in a new production plant, thereby relieving backlogs at product-specific plants; meet a demanding construction schedule, even through the winter months.
SVPA Solution:
After designing a building that reflects Pella Corporation’s stability and commitment to being a long-term member of the Sioux Center business community, SVPA facilitated meeting the schedule by incorporating precast concrete and other premanufactured materials. The new facility includes paint storage and mixing areas, as well as drive-through loading docks.
Completion Date:
September, 2000
Project Size:
272,000 s.f.
Type of Delivery:
Negotiated Contract
Work Team:
  • Steven Gray, AIA, IIDA
  • Kent Zarley, ASLA
  • KJWW Engineering Consultants
  • Charles Saul Engineering
  • Snyder & Associates
  • The Weitz Company
  • Became an SVPA client in: 1959

    Return


    Pella Corporation Building materials reflect Pella's commitment to the community of Sioux Center

    CLICK SMALL IMAGES TO ENLARGE >




    ARCHITECTUREINTERIOR DESIGNSTRUCTURAL ENGINEERINGLANDSCAPE ARCHITECTURE
    PLANNINGFEASIBILITY STUDIESSITE ANALYSISLEED CERTIFICATION
    SVPA Architects Inc.   1466 28th Street, Suite 200   West Des Moines, Iowa 50266-1430   [p] 515.327.5990   [f] 515.327.5991



    © SVPA Architects Inc. 2010

    Web Applications by Spindustry Systems
    Web Applications by Spindustry Systems