| Eldora Aquatic Center |
|
|
City of Eldora
Eldora, Iowa |
Client Challenge: Design a bath house for the new aquatic center that would be reflective of the civic pride in Pine Lake State Park.
|
SVPA Solution: The resulting design resembles the lodge at the Pine Lake and features family changing areas. Concessions, admissions, and office areas are in a separate wing.
|
Completion Date: May, 2006
|
Project Size: Bath House and Pool
|
Type of Delivery: Design/Bid/Build
|
Work Team:
- Vitus Bering, AIA
- Thad Long, AIA
- Water's Edge Aquatic Design
- Hoss & Brown Engineers
- Petersen Construction
|
|
Became an SVPA client in: 2005
|
|
|