Challenge: To make a connection to the existing fire station, with the incorporation of the existing medallions being recreated or relocated into the new building's façade.

SVPA Solution: The Des Moines Fire Station No. 1 project is located on Mulberry Street, just west of 13th Street, directly west of the Nationwide Parking Ramp. The building consists of a two-story administration and living quarters, and a six-bay apparatus area. The design utilizes limestone and brick masonry, glazed aluminum curtainwall and architectural metal panels. Mechanical equipment will be located in the building, so roof top equipment will be minimal in size, and not require screening.

Sustainable Design Techniques: The project incorporates a number of sustainable features and is LEED Certified. The project also uses Mid-American Energy’s CustomPlus incentive program. Daylighting strategies were incorporated as part of the design with Mid-American’s assistance. The design also utilizes a Geothermal heating/cooling system.

Completion Date: 2013

Project Size: 23,000 s.f.

Type of Delivery: Design Bid Build

Project Team:

  • Scott Hatfield, AIA, IIDA
  • Robert T. Ormsby, AIA, LEED AP
  • Josh Ridgely, AIA, LEED AP
  • Kent Zarley, ASLA
  • April Taylor, IIDA
  • Stecker-Harmsen, Inc.
  • Bishop Engineering
  • KJWW Engineering Consultants

Became an SVPA client in: 2009

Back to Civic Projects...