Vermeer Plant 2 Addition
Vermeer Manufacturing
Pella, Iowa

Challenge: Provide an office addition and remodel to the existing Plant 2 for Vermeer Manufacturing.

SVPA Solution: This project involved the remodeling of the existing offices and expanding the office building. The project site work consisted of minor grading, sidewalk removal and construction of new portland cement concrete sidewalks and driveway. Removal of existing and installation of new small diameter storm sewer piping was also included. The office addition building is approximately 7,050 s.f. The large conference and small conference rooms serve as a storm safe area with reinforced concrete block walls and a precast lid above. The new addition is a Group “B” occupancy. The existing factory is currently fully sprinklered and is a type “F1” occupancy. The two-hour wall between the factory and the existing office was maintained and the new office is separated from the factory with a two-hour fire wall. A one-hour separation is provided between the Oasis and the new office addition.

Completion Date: June 2013

Project Size: 7,050 s.f.

Type of Delivery: Negotiated Contract

Project Team:

  • Vitus Bering, AIA
  • Jon Oosterhuis, AIA
  • Danielle Williams, IIDA, LEED GA
  • Tometich Engineering
  • Garden and Associates

Became an SVPA Client in: 1963

Back to Warehouses / Manufacturing Projects...