Vermeer Plant 3 Addition
Vermeer Manufacturing
Pella, Iowa

Challenge: Provide a remodel to the existing Plant 3 for Vermeer Manufacturing.

SVPA Solution: This project involved the remodeling of 918 s.f. of the existing plant and new office building. The project site work consisted of minor grading, sidewalk removal and construction of new Portland cement concrete sidewalks and driveway. The office building is approximately 12,318 s.f. The restrooms serve as a storm safe area with reinforced concrete block walls and a precast lid above. The new addition is a Group “B” occupancy. The existing factory is currently fully sprinklered and is a type “F1” occupancy. The office is separated from the factory with a two-hour fire wall.

Completion Date: April 2015

Project Size: 918 s.f. remodel in existing 12,318 s.f. building

Type of Delivery: Negotiated Contract

Project Team:

  • Vitus Bering, AIA
  • Jon Oosterhuis, AIA
  • Danielle Williams, IIDA, LEED GA
  • KJWW Engineering
  • Garden and Associates

Became an SVPA Client in: 1963

Back to Warehouses / Manufacturing Projects...