Lely USA

SVPA Architects was asked to design a building for a joint venture between Lely USA and Vermeer Manufacturing on the Vermeer campus. The new building would need to both meet the standards for the European-based Lely and the Iowa-based Vermeer.

Client Since 1963
quick stats image description

Completion Date

October 2011

Project Size

6,360 SF (Office); 36,400 SF (Manufacturing/Assembly)

Type of Delivery

Negotiated Contract

Our Solution

The new manufacturing/assembly building would have two primary functions: a pre-engineered metal building for manufacturing/assembly space and an office space to support the assembly and distribution operations. The office portion of the building incorporates the Lely “red” corporate color on both the interior and exterior. A glazed curtainwall and an interior glass wall flood the interior with natural light, creating an inviting and comfortable work environment.