Blank Performing Arts Center, Simpson College
The current performing arts center was outdated and needed to be expanded to accommodate growing attendance rates.
The current performing arts center was outdated and needed to be expanded to accommodate growing attendance rates.
The client requested a master plan for a new high school campus that would be located on a 43-acre site.
SVPA Architects worked with the Washington Community School District on the Master Plan and design for a new high school and assisted the District in passing a bond referendum for an auditorium.
Simpson College chose to build a new campus center in 2003 as part of a campus master planning study. Initial design considerations placed the campus center between two existing residence halls and connected directly to the main dining …
When Rain and Hail outgrew its leased space, they turned to SVPA Architects and Mid-America Group. SVPA was challenged to design a building to meet Rain and Hail’s specific requirements for interior uses and functions; provide Mid-America Group …